NPPD- Keystone Diversion Dam

Location

6957+W9 Keystone, Nebraska, USA

Project Size

5,800 sq ft

Completed Date

2022

Prime Contractor

OCCI, Inc.

Client

North Platte Power District

Value

$355,000

About Project

The Keystone Diversion Dam at Lake Ogallala is part of the Nebraska Public Power District. The lake was drained in September of 2022 to complete maintenance on the dam.

TIC served as one of the maintenance contractors for the project. TIC’s scope of work called for the abrasive blasting and the application of a two-coat system consisting of a 100% solids primer and top coat.

Equipment and scaffolding for project the was craned into the work area by the general contractor to provide access.

Aerial View