I-270 Interchange Project

Location

Blues Hwy, St. Louis, MO 63131, USA

Project Size

835,800 sq ft

Completed Date

2023

Prime Contractor

KCI Construction Company & Kozeny Wagner

Client

MODOT

Value

$10,700,000

About Project

As part of the infrastructure improvement in Missouri, several bypasses across the state are seeing road improvements. In 2022, TIC began coating renovations to the I-270 interchanges at I-64, I-55 & I-44 in St. Louis County.

The project(s) scope of work included pressure washing and coating concrete bents and piers, completing faying surface work on replaced bearing locations, and SSPC SP 10 abrasive blasting and coating existing steel at multiple locations.

Coatings applied to structural steel included a two-coat epoxy-urethane system and a three-coat system of zinc, epoxy and urethane.

Aerial View

Drone View