Thomas Industrial Coatings was hired to modify and coat two existing jet fuel storage tanks for the US Army Corps of Engineers. The tanks, along with all associated piping and a new pump station, were completed in only a five month period. As we’ve mentioned before, we’ve never been ones to sit around and watch the paint dry.
