The Huey P. Long Bridge Approach job called for pressure washing, SP-10 near-white blasting, zinc/epoxy/urethane application, implementation of a coating system to 300,000 square feet of new approach girders. The projects also required an SP-3 vacuum-shrouded power tool cleaning for lead abatement at existing steel-removal areas.
All of which Thomas delivered. On-time and on-budget.