Working in a 300-feet deep shaft is hard enough. But when you have to work in two, well, it becomes twice as difficult. And that’s exactly the scope of work we encountered at the Lower Meramec Lift Station.
In one shaft, we had to apply a concrete lining system at more than 180 miles deep. And in the other shaft, we had to paint three coats to piping, sometimes as large as five feet in diameter.
Yet again, we’re proud to say we completed something that had never been done before with no injuries and on time.