Surface treatment and industrial painting on the Luling Bridge

The Luling Bridge is a cable-stayed bridge over the Mississippi River in Louisiana. It was the third major cable-stayed bridge in the United States. The bridge is noted for its unique design. Unfortunately, however, the inside of the Luling developed significant rust due to a design flaw.

That’s where we came in to help.

We were hired for pressure washing and the SP-2 hand-tool cleaning of 140,000 square feet of wind fairing steel; patching of 2,500 square feet of voids in wind fairing with an epoxy/urethane fiberglass coating system; and the application of an epoxy/urethane fiberglass coating system to the interior of the wind fairing steel to the tune of approximately 140,000 square feet.

This is a job that we’re proud to have our name on. A unique challenge calls for a unique solution – and we delivered.

Learn more

Employee Profiles New
X